Logs and limestones Oct 072019 April/May 2018: One of the logs had been damaged due to a water leak, and needed to be replaced. Here is the log removed from the cabin, and a new log is being prepared. Here the new log is installed. In addition limestones were laid under the cabin. The rocks under the rest of the cabin.