Oct 072019
 
April/May 2018: One of the logs had been damaged due to a water leak, and needed to be replaced.
Here is the log removed from the cabin, and a new log is being prepared.
Here the new log is installed. In addition limestones were laid under the cabin.
The rocks under the rest of the cabin.